technology

Pumps for Brazilian cellulose production

Pumps for Brazilian cellulose production

This autumn the KSB group will supply three boiler feed pumps for a new cellulose production plant located in Três Lagoas, in the federal state of Mato Grosso do Sul, Brazil.

The customer is one of the world’s leading producers of cellulose using eucalyptus plants.

The delivery comprises three HGC pumps, two of which are equipped with 4,350 kW, two-pole 4,000 volt variable-speed motors. The third pump set is driven by a turbine, also rated 4,350 kW. The flow rate of each pump set is around 1,011 cubic metres per hour and the discharge head is slightly more than 1,400 metres. All wetted parts are made of chrome steel.

The steam boilers, which must be supplied with feed water, provide the energy required for the cellulose production. The new production unit is an expansion of the existing factory which is already equipped with KSB pumps. It will increase the annual cellulose production from 1.75 million to 3.05 million tonnes. The favourable climatic conditions in South America ensure that eucalyptus trees are 20 metres tall and ready for felling after just eight years.

papnews logo

Edipap Srl | VAT IT09057310964 | Via Pordenone 13, 20132 - Milan - Italy | phone +39 02 21711614 | www.edipap.com | info@papnews.com

close and go back to site

Lost your password?

close and go back to site

My Agile Privacy

This site uses technical and profiling cookies. 

You can accept, reject, or customize the cookies by clicking the desired buttons. 

By closing this notice, you will continue without accepting.